February 11, 2022

𝐀𝐬 𝐑𝐞𝐪𝐮𝐞𝐬𝐭𝐞𝐝 𝐛𝐲 𝐍𝐚𝐭𝐢𝐨𝐧𝐚𝐥 𝐏𝐨𝐰𝐞𝐫 𝐂𝐨𝐫𝐩𝐨𝐫𝐚𝐭𝐢𝐨𝐧 (𝐍𝐏𝐂)

Date: 𝐅𝐞𝐛𝐫𝐮𝐚𝐫𝐲 𝟏𝟑, 𝟐𝟎𝟐𝟐/𝐒𝐔𝐍𝐃𝐀𝐘

Time: 𝟔:𝟎𝟎 𝐀𝐌 𝐭𝐨 𝟒:𝟎𝟎 𝐏𝐌

Purpose:

a. To facilitate change tapping/transposition of Codon-Virac (Marinawa) Transmission Line at span between pole numbers CV003-CV004 at Barangay Asgad, San Andres.

b. To conduct installation of 69kV (Virac-San Miguel Transmission Line) SF6 Power Circuit Breaker (PBC) mounting base

Affected Areas: 𝐅𝐄𝐄𝐃𝐄𝐑 𝟑𝐀 𝐚𝐧𝐝 𝐁, 𝐅𝐄𝐄𝐃𝐄𝐑 𝟔𝐀 𝐚𝐧𝐝 𝐁

𝐄𝐧𝐭𝐢𝐫𝐞 𝐌𝐮𝐧𝐢𝐜𝐢𝐩𝐚𝐥𝐢𝐭𝐲 𝐨𝐟 𝐕𝐢𝐠𝐚, 𝐏𝐚𝐧𝐠𝐚𝐧𝐢𝐛𝐚𝐧, 𝐁𝐚𝐠𝐚𝐦𝐚𝐧𝐨𝐜, 𝐂𝐚𝐫𝐚𝐦𝐨𝐫𝐚𝐧, 𝐏𝐚𝐧𝐝𝐚𝐧, 𝐒𝐚𝐧 𝐀𝐧𝐝𝐫𝐞𝐬

𝐒𝐚𝐧 𝐌𝐢𝐠𝐮𝐞𝐥

Kilikilihan, Pacogan, Mabato, Siay, Dayawa, Buhi, Pangilao, Obo, Patagan Salvacion, Patagan Sta. Elena, Katipunan, Balatohan, Pagsangahan, San Marcos, Tobrehon, JM Alberto, Paraiso, Alma Progresso

𝐆𝐢𝐠𝐦𝐨𝐭𝐨

Sicmil

𝐕𝐢𝐫𝐚𝐜

Cabihian, Hawan Ilaya, Hawan Grande, Balite, F. Tacorda Village, Buenavista, Calampong, Marilima, Batag, Palta Proper, Palta Salvacion, Palta Small, Calabnigan, Sto. Cristo, Sto. Domingo

Power may resume sooner or later than estimated schedule depending on the completion of the activity.

Thank you.

Source: First Catanduanes Electric Cooperative, INC.


Leave a comment..